This Long Range Plan version was adopted in June 2000. Development of the plan took over three years and included very extensive data collection and analysis. The CMPO's computer based Travel Demand Model was developed as part of this update. This included the completion of a detailed origin & destination study to help determine traffic flow patterns in the Cache Valley and calibrate the Travel Demand Model. While not the current plan (click here for current plan), this plan established many of the priorities that have been carried forward to subsequent plan updates. Long Range Plan Documents CMPO 2025 Long Range Transportation Plan (Main Document, 103 pages 1.9 MB PDF file) Appendix A -Financial Plan Element Appendix B- Project Identification (1.5 MB) Appendix C- Project Evaluation Criteria Appendix D- Remaining Project Evaluation (3.7 MB) Appendix E- Short Range Transit Plan Appendix F- Long Range Pedestrian/Bicycle Plan (11.4 MB) Appendix G- Airport Expansion Plan Appendix H- Public Involvement Process Appendix I- Corridor Preservation Techniques Appendix J- Access Management Techniques Appendix K- Traffic Signal Location Master Plan (8.6 MB) Appendix L- TEA-21 Guidelines & Federal Policy Guide Appendix M- Plan Adoption Process and Public Comment Phase One Data Collection Technical Memorandums TM-Quality Assurance & Control Plan TM-Project Committee Structure 1-PA-110-DO TM- Data Collection Methodology 1-TM-0110-RO (1.8 MB) TM-Model Development Methodology 1-TM-0230-RO (1.2 MB) TM-Agency/Public Involvement Plan 1-PA-0210-DO TM-Travel Analysis Zones Review 1-TM-0220-DO TM-Traffic Data and Analysis Report 1-TM-0190-RO (2.5 MB) TM- Traffic Signal Location Master Plan Study Area Refinement TM-Year 2020 Baseline Model Results TM- Future Year Baseline Model Network 1-TM-410-DO TM- Travel Demand Training Methodology TM- Model Development and Validation Report 1-TM-0260-RO (2.7 MB) TM- Preliminary Environmental Overview (3.5 MB) TM- Cache MPO Traffic Signal Location Master Plan (5.2 MB) TM- 2020 Baseline and Alternatives Model Development Report 1-TM-0430-RO (1.6 MB) TM- Phase One Summary Report Help us Plan for a Mobile Future We need your input!© 2005 by the Cache Metropolitan Planning Organization. All rights reserved. |